Constructing the
Puncheons:
Installing
Assembly in Wetland
- Carry timber assemblies to wetland.
- Grub away upper layer of soil and level each assembly. We sited them 6' apart or
about 8' on center.
- Keep them roughly level with each other working with grade changes where
necessary.
More views!